Rail Related Works
Moor Park, London
Assistance to main contractor with tender for stabilisation work to LUL embankment.
Greenford, Middlesex
Category III check on embankment stabilisation design involving gabions and lime piles.
Westbury, Wiltshire
Design of soil nailing scheme to stabilise an embankment.
Bentley, Hampshire
Design of stabilisation works for underpass wingwalls.
Easterton and Lavington, Wiltshire
Category III design checks for stabilisation work using gabions on two sections of railway embankment.
Burliegh, Gloucestershire
Category III design check for stabilisation work using gabions on railway embankment.
Bredon, Worcestershire
Category III check on design of drainage measures to stabilise a railway cutting slope.
Ardington, Oxfordshire
Category III design check for stabilisation work using gabions on railway embankment.
Redcar, Cleveland
Design of thrust pit and ground movement predictions for construction of gas pipeline below railtracks.
Denaby, South Yorkshire
Category III design check on predicted ground movement around two pipelines to be constructed below railtracks.
Buckinghamshire
Design of stabilisation works to railway embankment/tip slope using fired soil nails and 'soft' facing.
St Pancras, London
Design of anchorage system to stabilise existing 19th Century gravity canal basin retaining wall to resist increased loading from the Channel Tunnel Rail Link.